Installation procedures are as follows:
1. remove the receptacle board on the UPS rear panel, as shown in Figure 15. retain the six rear panel mounting screws
for securing the box assembly to the UPS.
Figure 15: Removing the receptacle board
2. Take out the box assembly from the accessories and split it into cover, box, Base 1 and Base 2, as shown in Figure 16.
Set the six screws aside for reassembly of the hardwire box.
Figure 16: Splitting the box assembly
3. Use two rear panel mounting screws to install Base 1 to the UPS rear panel, as shown in Figure 17.
Figure 17: Installing Base 1
UPS
Receptacle board
Screw (6 pcs)
Screw (6 pcs)
Base 1
S4K2U-5C SEriES USEr mAnUAL | 23
Screw (2 pcs)
Base 1
Cover
Box
Base 2