Installation; General; Unpacking; Placement - ESAB m3 Plasma EPP-202 Instruction Manual

Plasma power source
Table of Contents

Advertisement

installation

general

Warning

unpacking

Inspect for transit damage immediately upon receipt.
Remove all components from shipping container and check for loose parts in container.
Inspect louvers for air obstructions.

placement

A minimum of 1 meter (3 ft.) clearance on front and back for cooling air flow.
Plan for top panel and side panels having to be removed for maintenance, cleaning and inspection.
Locate the plasma unit relatively close to a properly fused electrical power supply.
Keep area beneath power source clear for cooling air flow.
Environment should be relatively free of dust, fumes and excessive heat. These factors will affect
cooling efficiency.
caution
installation
failure to folloW instructions coulD leaD to Death, in-
JurY or DamageD propertY. folloW these instructions
to preVent inJurY or propertY Damage. You must com-
plY With local, state anD national electrical anD safetY
coDes.
conductive dust and dirt inside power source may cause arc flash-
over. equipment damage may occur. electrical shorting may occur if
dust is allowed to build-up inside power source.
see maintenance section.
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

0558011310055801131105580113120558011313

Table of Contents