Table of Contents

Advertisement

9.
Connect one end of the CAT5 (or greater) Ethernet cable with PoE to the 100/1000 Ether-
net connector on the underside of the AP.
10.
Check that the AP822eV2 is operating correctly before replacing the ceiling tile to the ceil-
ing. It can also be installed with the AP822eV2 on top by flipping cross bar. Verify correct
operation using the LEDs, as shown in

LED Lights

When AP822 first connects to the controller (and any time the access point is rebooted), the
AP initializes and then is programmed by the controller. When the AP first powers up, the LED
is green. Thereafter, its color indicates its operating status.
36
"LED Activity and Meaning"
on page
38.
LED Lights

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap822Ap822ev2Ap822iv2

Table of Contents