Boiler/Plumbing Kit Placement; Installation Requirements - Electro Industries EB-MX-10 Installation & Operating Instructions Manual

Electro-boiler midsize
Table of Contents

Advertisement

BOILER/PLUMBING KIT PLACEMENT

This model series is wall hung and the vessel must be vertical, drawing BX505.
The plumbing kit items are located adjacent to the boiler housing itself as shown on drawing BX501 or
BX505.
For future servicing, the unit itself must be installed 20" or more above the floor, the elements are
screwed in from the bottom.
INFORMATION/WATER FLOW CALCULATIONS
Water flow, GPM, can easily be calculated if the temperature rise across the electric boiler can be
measured.
The formula below can only be used when the temperature rise is stable and the boiler is not hi-limiting.
In other words, verify constant current draw and stable outlet temperatures for at least 15 minutes.
Volts x Amps x 3.4
GPM =
500 x Temp. rise

INSTALLATION REQUIREMENTS

1. All installation work must be performed by trained, qualified contractors or technicians. Electro
Industries, Inc., sponsors installation and service schools to assist the installer. Visit our Website at
electromn.com for upcoming service schools.
WARNING
ALL ELECTRICAL WIRING MUST BE IN ACCORDANCE WITH NATIONAL ELECTRIC CODE
AND LOCAL ELECTRIC CODES, ORDINANCES, AND REGULATIONS.
WARNING
OBSERVE ELECTRIC POLARITY AND WIRING COLORS. FAILURE TO OBSERVE COULD
CAUSE ELECTRIC SHOCK AND/OR DAMAGE TO THE EQUIPMENT.
CAUTION
This unit can only be used for its intended design as described in this manual. Any internal
wiring changes, modifications to the circuit board, modifications or bypass of any controls, or
installation practices not according to the details of this manual will void the product warranty,
the CSA/us certification label, and manufacturer product liability. Electro Industries, Inc.,
cannot be held responsible for field modifications, incorrect installations, and conditions which
may bypass or compromise the built-in safety features and controls.
2. This installation manual and Electro-Boiler products relate only to the addition of the Electro-Boiler
to the hydronics system. The owner/ installer assumes all responsibility and/or liability associated
with any needed installation of the gas/oil boiler, pump, plumbing, system design, hydronics systems
or backup gas/oil boiler, etc. Any instructions or comments made within this manual (or factory
phone assistance) relating to the gas/oil furnace are provided as comments of assistance and "helps"
only.
CAUTION
Hazards or unsafe practices could result in property damage, product damage, severe personal
injury and/or death.
10/27/2016
5
BI516

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eb-ms-15Eb-ms-20Eb-ms-10Eb-mx-15Eb-mx-20

Table of Contents