Veris Industries H8150-1600-4-3 Installation Manual page 7

Energy meter
Table of Contents

Advertisement

Installation Guide
Power Monitoring
H81xx
Installation (cont.)
Z205338-0F
Page 7 of 10
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
1.888.610.7664
10. H8163 and H8167: Set the Pulse Rate selection switch to the desired output rate (kWh per pulse). Note that 0.1 is not valid for
1600 A systems, and 0.1 and 0.25 are not valid for 2400 A systems.
11. Secure the meter cover shut using a padlock, wire tie, or other locking device.
12. Apply power to the meter.
13. Check the display. At initial power-up, the meter checks each phase. If the phasing is correct, an OKAY message appears. If
the phasing is incorrect, an error message indicates which color leads are not connected properly. Disconnect power before
reconnecting leads.
14. Check the power reading. Expected power is estimated as follows:
kW = Volts(L-L) * Amps * 1.732 * PF 1000
kW = horsepower * 0.746
15. To reset the kWh accumulator to zero, press and hold the two pushbuttons on the inside of the meter cover for 10 seconds.
16. To reset the kW max. register, press and hold the two pushbuttons on the inside of the meter cover for 5 seconds.
©2013 Veris Industrie
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
www.calcert.com
15
10
20
5
25
0
30
Display
Plain
Full
Black
Black
Red
Yellow
Red
Yellow
+ - + - + -
N
A
B
C
+ A D + B D
+ C D
N
A
B
C
sales@calcert.com
TM
09132

Advertisement

Table of Contents
loading

Table of Contents