To Connect The Pc Configurator To The Compressor Unit; Commissioning; Precautions When Commissioning; Checklist Before Commissioning - Daikin VRV IV RKXYQ8T7Y1B Installation And Operation Manual

Compressor unit for indoor installation
Hide thumbs Also See for VRV IV RKXYQ8T7Y1B:
Table of Contents

Advertisement

7 Commissioning

6.1.9
To connect the PC configurator to the
compressor unit
5 HP
a
b
X41A
A1P
2
3
a
PC
b
Cable (EKPCCAB)
X27A
Connector
X41A
Connector
A1P
Compressor unit main PCB
7
Commissioning
After installation and once the field settings are defined, the installer
is obliged to verify correct operation. Therefore a test run must be
performed according to the procedures described below.
7.1

Precautions when commissioning

CAUTION
Do not perform the test operation while working on the
indoor units or the heat exchanger unit.
When performing the test operation, not only the
compressor unit will operate, but the heat exchanger unit
and the connected indoor units as well. Working on an
indoor unit or the heat exchanger unit while performing a
test operation is dangerous.
NOTICE
Be sure to turn on the power 6 hours before operation in
order to have power running to the crankcase heater and
to protect the compressor.
During test operation, the compressor unit, the heat exchanger unit
and the indoor units will start up. Make sure that the preparations of
the heat exchanger unit and all the indoor units are finished (field
piping, electrical wiring, air purge, ...). See installation manual of the
indoor units for details.
7.2

Checklist before commissioning

After the installation of the unit, first check the following items. Once
all below checks are fulfilled, the unit must be closed, only then can
the unit be powered up.
You read the complete installation and operation
instructions, as described in the installer and user
reference guide.
Installation and operation manual
26
8 HP
a
b
X27A
A1P
4
5
Installation
Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.
Field wiring
Be sure that the field wiring has been carried out
according to the instructions described in the chapter
"5.7  Connecting the electrical wiring"  on page 
according to the wiring diagrams and according to the
applicable legislation.
Power supply voltage
Check the power supply voltage on the local supply panel.
The voltage must correspond to the voltage on the
identification label of the unit.
Earth wiring
Be sure that the earth wires have been connected
properly and that the earth terminals are tightened.
Insulation test of the main power circuit
Using a megatester for 500  V, check that the insulation
resistance of 2  MΩ or more is attained by applying a
voltage of 500 V DC between power terminals and earth.
Never use the megatester for the transmission wiring.
Fuses, circuit breakers, or protection devices
Check that the fuses, circuit breakers, or the locally
installed protection devices are of the size and type
specified
in
the
chapter
requirements" on
page 9. Be sure that neither a fuse nor a
protection device has been bypassed.
Internal wiring
Visually check the electrical component box and the
inside of the unit on loose connections or damaged
electrical components.
Pipe size and pipe insulation
Be sure that correct pipe sizes are installed and that the
insulation work is properly executed.
Stop valves
Be sure that the stop valves are open on both liquid and
gas side.
Damaged equipment
Check the inside of the unit on damaged components or
squeezed pipes.
Refrigerant leak
Check the inside of the unit on refrigerant leakage. If there
is a refrigerant leak, try to repair the leak. If the repair is
unsuccessful, call your local dealer. Do not touch any
refrigerant which has leaked out from refrigerant piping
connections. This may result in frostbite.
Oil leak
Check the compressor for oil leakage. If there is an oil
leak, try to repair the leak. If the repairing is unsuccessful,
call your local dealer.
Air inlet/outlet
Check that the air inlet and outlet of the unit is not
obstructed by paper sheets, cardboard, or any other
material.
Additional refrigerant charge
The amount of refrigerant to be added to the unit shall be
written on the included "Added refrigerant" plate and
attached to the rear side of the front cover.
VRV IV compressor unit for indoor installation
17,
"4.3.2 
Safety
device
RKXYQ5+8T7Y1B
4P408443-1B – 2016.04

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv iv rkxyq5t7y1b

Table of Contents