Download Print this page

Insignia GT0509 Instruction Manual page 9

Advertisement

www.insigniarange.com
Last Modified: 08/10/2015
TO START
Make sure you have a clear space, remember when finished and in place you need access to check your build and able to pull the shower out for servicing or should you
have the need to replace anything!
Take the shower tray and remove all the protective wrapping and fit the waste. If you purchased the fitting kit it is possible this may have already been fitted in the tray hole
yet please note this is only for transportation reasons therefore you will still need to ensure the correct sealing and alignment is carried out. In the side of the waste supplied
in the optional fitting kit you will notice a spigot not seen on an ordinary waste. In most cases this is blanked yet should you have a steam version you need to gently drill this
out as this item is for the steam generator drainage and will be connected in the instructions later.
Now please level the tray by firstly placing the tray in its final location and then using a spirit level, adjust the tray feet accordingly. Once you are happy with the levelling of
the tray, you can pull it out to begin the main construction.
09

Advertisement

loading