4-2 Power supply from the battery
1)
Install the " DC3V battery ( CR-2032 ) x 2 PCs "
into the " Battery compartment " ( 3-14, Fig. 1)
2)
Slide the " Power type switch " to the " B " position (
battery position ), the meter will offer the power
source from the battery.

5. MEASURING PROCEDURE

5-1 precautions & preparations for measurement
5-2 Power management
1)Pressing the " Power On button " ( 3-2, Fig. 1 ) once,
the meter will be power On.
2)The meter will be power Off automatically within
3 minutes after power On.
1) Place the Red & Black Test Leads into
the proper input terminal before
making measurement.
2) Remove either of the test leads from
the circuit when changing the
measurement range.
3) Do not exceed the maximum rated voltage
and current to the input terminal.
4) For safety consideration, when change
the new test leads, it should use the
replace approval test leads.