The Ct And Pt Measurement - Lutron Electronics DW-6095 Operation Manual

Table of Contents

Advertisement

5-5 The CT and PT measurement

A : Diagram
B : Operation Instructions
B-1 : Power on the instrument by pressing POWER KEY,
and then press 1Φ 3Φ KEY to select the 3Φ 4W system,
the selected name of system will be appeared on bottom
left display of screen 2.
B-2 : Connect the line voltage L1, L2, L3 and Vn to V1, V2
,V3 and N terminals of the instrument.
B-3 : Place the conductor of CP-1201(A1), CP-1201(A2),
CP-1201(A3) hook to A1, A2 , A3 as screen 1.
B-4: Connect the outputs of clamp meter CP-1201(A1),
CP-1201(A2), CP-1201(A3) to A1, A2, A3 terminals
of the instrument.
B-5: The related measuring factors will be appeared on
display, about the instruction of factor please refer
appendix 1 ( 5-16, page 68 ).
screen 1 ( 5-5 )
52

Advertisement

Table of Contents
loading

Table of Contents