Download Print this page

Speakman S-1496-LH Instructions page 3

Advertisement

11
Turn on water supplies. Turn on Valve to the "WARM"
position and flush for 1 minute.
SERVICE INSTRUCTIONS
Service Instructions
Caution- Any repair or servicing of the Valve may effect the maximum outlet
temperature setting of the Valve. After working on the Valve, make sure the maximum
outlet temperature is set to the recommended setting of 1 10 °F.
Cartridge Removal: see STEP 8.
1) Shut off the HOT & COLD water supplies to the Valve.
2). Remove Valve Handle and the Dial Plate as outlined in STEP 3.
3) With the Valve in the "OFF" position, remove the four (x4) Valve Bonnet Screws.
Carefully remove the Cartridge Assembly. Ensure nothing is left over in the Valve Body
cavity.
S-1496-LH / S-1498-LH REPAIR PARTS
12
To install a Shower Head (not included),
apply Thread Seal Tape to threads of Shower Arm (1). Thread Shower Head (2) onto
Shower Arm (1) and tighten with Adjustable Wrench. Check all connections for leaks.
NOTE: Shower head not
included with all models.
Shown for reference only.
4) Replace with new Cartridge Assembly. Make sure the Large Bonnet O-Ring Seal is
installed and seated properly in the Valve Body. Reassemble the Cartridge Assembly,
making sure the "UP" on the Bonnet is in the up position. Tighten the four (x4) Bonnet
Screws. Turn "ON" the HOT & COLD water supplies. Check the Valve for leaks.
5) To limit the maximum outlet temperature the Valve delivers, see STEP 9.
6) Reassemble the Dial Plate and the Handle as outlined in STEP 10.
ITEM NO.
PART NO.
RPG04-0367-PC
HANDLE WITH SCREW
RPG05-106096
RETROFIT "PB KIT
RPG04-0367-PC
HANDLE WITH SCREW
RPG05-0718
4 SCREWS, BONNET, AND BONNET O-RING
SPEAKMAN
®
SPEAKMAN
®
DESCRIPTION

Advertisement

loading

This manual is also suitable for:

S-1498-lh