Download Print this page

Fleck 9000 Installation Manual page 10

Twin tank water softener
Hide thumbs Also See for 9000:

Advertisement

3 › I n s ta l l I n G t H e f l e c K 9 0 0 0 Va lV e
1) Remove the filling funnel and tape and while
using the included silicone lubricant packet, lu-
bricate the inner and outer o-rings on the bottom
of the Fleck 9000 Meter Valve and the second
tank adapter as shown in Figures 10-A and 10-B
3) Loosen the two valve case screws to uncover the
front of the valve to prepare for the next step of
removing the plumbing adapter clips (Figure 10-E)
PAGE 10
Va lV e
a d a P t e r . f I G u r e 10 - a
Va lV e
a d a P t e r . f I G u r e 10 - b
f I G u r e 10 - e
QualityWaterForLess.com
top screen/upper distributor (stan-
2) Loosely fit a
dard or fine mesh)
9000 Meter Valve and the second tank adapter,
make a mark through both of the screen screw
holes on both screens, drill two 3/32" holes on both
top screens at those marks, and screw into place
(Figure 10-C). Then place the valve onto the top of
the tank with the riser tube fitting into the central
o-ring on the valve (Figure 10-D).
Do not use Teflon tape or pipe
valve to the tank.
dope on the valve or tank threading
s ta n d a r d
f I n e M e s H
4) Please review the diagram below to make sure
you install the meter, bypass, and tube assembly
on the correct side of the valve (Figure 10-F).
i Please note that you absolutely must not
attach these components on the wrong side
of the valve
Tank 2
Tube Assembly
Tank 2 Adapter
s y s t e M t o P V I e w . f I G u r e 10 - f
to the bottom of the Fleck
Hand-tighten
f I G u r e 10 - c
f I G u r e 10 - d
Tank 1
Water Meter
Outlet
Inlet
Bypass Valve
Main Control Valve
Help: 888-426-5001
the

Advertisement

loading