Transport, Installation and Connection
4
Transport, Installation and Connec-
tion
All installation and connection work may be carried out by
qualified and approved specialist staff only !
The legal regulations as well as adjustment instructions of
the plant operator have to be observed!
4.1
Scope of delivery
• Compact Flame Controller CFC 1000L
• Operating instruction BA CFC 1000L EN
• Harting cable terminal box kit (not with ex-proof hous-
ing)
4.2
Accessories (optional)
• Power supply unit 230/115 V AC
• 1" ball-flange with 2" flange disk
• 1" 3-way-ball-valve
• 1" heating insulator
• 1" pressure barrier 5 bar
• Optical alignment device
• Ex-proof housing
• Fiber optic cable
• Double nipple
• Operating instruction HB CFC Com1 EN
Refer to the order papers for the exact scope of delivery
and compare with the delivery note.
Checking for completeness
Check the entire delivery for completeness against the ac-
companying delivery note. Please refer to our terms of
sale and delivery otherwise.
4-1
Need help?
Do you have a question about the CFC 1000L and is the answer not in the manual?
Questions and answers