Transport, Installation And Connection; Scope Of Delivery; Accessories (Optional); Checking For Completeness - BFI Automation CFC 100 Original Operating Instructions

Compact flame controller
Table of Contents

Advertisement

Transport, Installation and Connection

4
Transport, Installation and Con-
nection
All installation and connection work may be carried out by
qualified and approved specialist staff only !
The legal regulations as well as adjustment instructions of
the plant operator have to be observed!
4.1

Scope of delivery

 Compact Flame Controller CFC 100
 Operating instructions BA CFC100 EN
4.2

Accessories (optional)

 Power supply unit 230/115 V AC
 1" swivel mount with 2" flange disk
 1" 3-way-ball-valve
 1" heating insulator
 pressure barriers
 Optical alignment device
 Hand held terminal HT100
Refer to the order papers for the exact scope of delivery
and compare with the delivery note.
4.3

Checking for completeness

Check the entire delivery for completeness against the ac-
companying delivery note. Please refer to our terms of
sale and delivery otherwise.
4.4

Report any damage

After arrival of the device and accessories, notify the ship-
ping agent, the insurance company and BFI Automation
immediately in case of any damage caused by transport
or inadequate packaging.
Take steps to minimise and prevent further damage.
Report the insurance case to the insurance company
without delay and transmit the full claim documents at
once in order to expedite the claims settlement (at the lat-
est in sufficient time before the expiry of any periods of
preclusion and/or limitation relating to the compensation
claims against third parties).
4-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CFC 100 and is the answer not in the manual?

Table of Contents