3.2 Installation method and corresponding static load
3.2.1 Screw fixed installation method and static load
1)158.75 Module
Screw installation method
Static load(Test load)
Module Type
JNMM60-XXX
JNMM72-XXX
JNMP60-XXX
JNMP72-XXX
JNMP120-XXX
JNMP144-XXX
2)166 Module
This document is only for internal use of JINNENG CLEAN ENERGY TECHNOLOGY LTD, and shall not be published or
copied without permission of the company.
Local latitude
0° ~15°
15° ~25°
25° ~30°
30° ~35°
35° ~40°
>40°
Installation of cross beam through long side four hole bolt
Installation Method
Installation angle
15°
latitude
latitude+5°
latitude+10°
latitude+15°
latitude+20°
Table 3
Installation of cross beam through long
side four hole bolt
+5400Pa/-2400Pa
+5400Pa/-2400Pa
+5400Pa/-2400Pa
+5400Pa/-2400Pa
+5400Pa/-2400Pa
+5400Pa/-2400Pa
Table 4