Download Print this page

Jinergy JNMP60 Installation Manual page 21

Crystalline silicon pv module

Advertisement

The forklift can loading 3T or more,
raising the module smoothly pull out
3
and keep slow speed when holding
the module.
7.2 Operating procedure of unpacking
1. Suitable for 158.75/166 single glass modules
S/N
Operating Procedure
Cut off the packing tape, remove the
1
top package down and hold on flat
floor.
Cut off the packing tape and remove
2
the box cover.
3
Cut off the inner packing belt.
1. Two
professional
unpacking the module together from
back side.
2. When take off the last eight
4
modules, the outermost module must
be slanted to lean on the other
modules (If not may result in hidden
cracks or damage when the module
tilted).
2. Suitable for 166 double glass modules
This document is only for internal use of JINNENG CLEAN ENERGY TECHNOLOGY LTD, and shall not be published or
copied without permission of the company.
Photo
people
4. Start from the short side of the packing
box, reduce modules that are broken.
5. When second transportation, a special
person should be command to carry, and
it is prohibited to damage the packing
box.
6. During operation, the forklift truck
should not hit the pallet including the
pallet wooden pier.
1. Box
transportation
horizontal or tilted to the direction of forklift.
2. The vertical surface of the forklift arm
should be smooth and there are no
something that sticks out.
3.
If the forklift hold up from the short side,
forklift arm length of about 1520 mm or
more.
Control Point
Operators must wear gloves to prevent
scratching of their hands by frame and
keep the glass surfaces clear.
Don't scratch the aluminum frame when
cutting the packing belt.
needs
to
keep

Advertisement

loading

Related Products for Jinergy JNMP60