Daikin VRV 5 BS4A14AJV1B Manual page 86

Branch selector unit
Hide thumbs Also See for VRV 5 BS4A14AJV1B:
Table of Contents

Advertisement

16
|
Electrical installation
16.3 To finish the electrical wiring
Installer and user reference guide
86
b Transmission cable (field supply)
c Tie-wrap (accessory)
Guidelines
Make sure the length of the earth wire between the fixation point and the
terminal is longer than the length of the power supply wires between the fixation
point and the terminal.
Cut a slit in the rubber bushing where cables enter the switch box.
Attach the cables onto the outer cable jacket and NOT onto the wires.
Do NOT strip the outer cable jacket lower than the fixation point.
Leave sufficient spare cable (± 20  cm additionally) for all cables between the
fixation point inside the switch box and the fixation point on the side of the BS
unit. This spare cable is required to lower the switch box.
a
b
a Spare cable
b Switch box in upper position
c Switch box in lower position
6 Reattach the service cover. See
CAUTION
Be careful NOT to pinch cables between the service cover and the switch box.
After installing the transmission wires, wrap them along with the onsite refrigerant
pipes using finishing tape, as shown in the illustration below.
a
c
d
a Liquid pipe
b Gas pipe
c High pressure / low pressure gas pipe
MAX
"14.3.2 To close the
f
b
e
c
4
unit" [
 61].
a
d
BS4~12A14AJV1B
VRV 5 branch selector unit
4P695527-1 – 2022.02