Keiser 3110 Series Assembly Instructions Manual

Keiser 3110 Series Assembly Instructions Manual

Power rack

Advertisement

Quick Links

MODELS 3110XX, 3111XX
INSTALLATION REQUIREMENTS
Verify planned equipment location is
sound surface and
meets the following dimensions criteria:
Height Clearance
Footprint (DxW)
Insert Platform
configuration (DxW)
Olympic Lifting
Insert Platform
configuration (DxW)
Free Space
72 inches
around Equipment
(1,829 mm)
(recommended)
*Multiple Racks may share side Free Space.
Note to Installer:
Note to Customer:
Skill level:
Product failure due to improper installation is not covered under warranty.
CUSTOMER SUPPORT
If you have any questions regarding the
after reading this guide, contact Keiser Customer Support:
1 559 256 8000
service@keiser.com
keiser.com/support
Keiser, the Keiser logo, and other trademarks associated with Keiser products referred to in this publication are trademarks of Keiser Corporation.
© Copyright 2020, Keiser Corporation. All rights reserved.
Distribution and copying of this document, use and communication of its contents is not permitted without written authorization from Keiser Corporation. The content
of this document is furnished for informational use only, may be subject to change without notice, and should not be construed as a commitment by Keiser Corporation.
Every effort has been made to ensure that the information in this manual is accurate. Keiser Corporation is not responsible for printing or clerical errors.
315502_A
ASSEMBLY INSTRUCTIONS
KEISER STRENGTH
POWER RACK
a solid, level, and structurally
3110XX
3111XX
8-foot ceiling
9-foot ceiling
96 in
108 in
(2,439 mm)
(2,743 mm)
103 in x 71 in
(2,616 mm x 1,804 mm)
108 in x 71 in
(2,743 mm x 1,804 mm)
183 in x 100 in
(4,648 mm x 2,540 mm)
Sides*
Front
Rear
48 inches
12 inches
(1,219 mm)
(305 mm)
READ CAREFULLY. KEEP THESE INSTRUCTIONS.
Be sure to leave Assembly Instructions with the customer.
Keep Assembly Instructions for future reference.
Professional installation is required by qualified personnel.
Assembly Instructions
3111XX model
KEISER CORPORATION
2470 S. Cherry Ave.
Fresno, CA 93706

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3110 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Keiser 3110 Series

  • Page 1 Distribution and copying of this document, use and communication of its contents is not permitted without written authorization from Keiser Corporation. The content of this document is furnished for informational use only, may be subject to change without notice, and should not be construed as a commitment by Keiser Corporation.
  • Page 2: Table Of Contents

    INTRODUCTION warranty registration. Congratulations on the purchase of your new Keiser Power Rack and welcome to the Keiser family. For your safety, and to ensure optimal equipment performance, please read and understand this manual before assembly. If you have any questions regarding assembly after reading this...
  • Page 3: Important Safety Information

    Maintain safety and serial number labels. Do not remove result in serious injury. labels for any reason. They contain important information. 12. Keiser Corporation is not responsible for damage or serious If unreadable or missing, contact Keiser Corporation for a injury caused by incorrect installation, assembly, or use.
  • Page 4: Equipment Specifications

    POWER RACK ASSEMBLY INSTRUCTIONS EQUIPMENT SPECIFICATIONS Size and weight specifications: 3111 Power Rack 3110 Power Rack 9-foot ceiling 8-foot ceiling 94 in 106 in (2,388 mm) (2,693 mm) 935 lbs 955 lbs (424 kg) (433 kg) 103 in 103 in 71 in 71 in (2,616 mm)
  • Page 5: Assembly

    The standard Power Rack assembly configuration may be anchored directly onto concrete flooring at the four anchor points (see Figure 3; anchor bolts not supplied). All other assembly configurations (Insert Platform and Olympic Lifting Insert Platform) requires the Power Rack to be bolted onto the platform (hardware supplied by Keiser Corp.). All Anchors Fasteners: •...
  • Page 6 NOTE: Optional Olympic Lifting Insert and Insert Platforms (including optional accessories) not shown. Check for any damage or missing parts. If parts are damaged or missing, contact your local dealer, distributor, or Keiser Customer Support by telephone at 1 559 256 8000.
  • Page 7 POWER RACK ASSEMBLY INSTRUCTIONS UNPACKING TWO-PERSON PROCEDURE: Due to the size of the equipment parts, help is required to safely and successfully complete the assembly procedure. HEAVY OBJECT: Help is required during lifting to avoid muscle strain or back injury. IMPORTANT: Crate configuration varies based on customer order and shipping destination.
  • Page 8: 08_Assembly Procedure

    POWER RACK ASSEMBLY INSTRUCTIONS ASSEMBLY PROCEDURE TWO-PERSON PROCEDURE: Due to the size of the equipment parts, help is required to safely and successfully complete the assembly procedure. HEAVY OBJECT: Help is required during lifting to avoid muscle strain or back injury. ASSEMBLE YOUR INSERT PLATFORM OR OLYMPIC LIFTING INSERT PLATFORM FIRST See platform assembly diagram included with the platform.
  • Page 9 POWER RACK ASSEMBLY INSTRUCTIONS INSTALL POWER MODULES AND DISPLAY Have your helper raise the Actuator Tab (press Foot Pedal) as you begin to position the Power Module on the Base Plate. Release the Foot Pedal before the Actuator Tab enters the Power Module; pull the wire and air lines through the Bottom Frame.
  • Page 10 POWER RACK ASSEMBLY INSTRUCTIONS CONNECT AIR LINES AND COMMUNICATION WIRE Remove the Bolts and Washers at the Bottom Frame. Tilt a Power Module with Bottom Frame to position the Cable Tray. Then, route the Air Lines / Communication Wires and install the Cable Tray. Power Module Bottom Frame Cable Tray...
  • Page 11 POWER RACK ASSEMBLY INSTRUCTIONS POWER DISPLAY CONNECTION CHECK AND BENCH POSITIONER INSTALLATION NOTE: Air Compressor not required to turn on the Power Display. Turn on the Power Display by momentarily pressing both + and – Foot Pedals. RESISTANCE window change from OFF to CLEr > 0 = proper connection. Power Display enters sleep mode (OFF) after 1 minute of inactivity.
  • Page 12 POWER RACK ASSEMBLY INSTRUCTIONS SET REAR POSTS IMPORTANT: DO NOT TIGHTEN BOLTS UNTIL FINAL INSTALLATION. PARTS MUST BE ABLE TO ADJUST FOR EASY BOLT HOLE ALIGNMENT. REAR POST Tall end facing Power Module 4-bolt pattern on rear face Comm. Port and Decals face inward RIGHT REAR POST...
  • Page 13 POWER RACK ASSEMBLY INSTRUCTIONS INSTALL REAR CROSS BRACE AND TOP POWER DISPLAY IMPORTANT: BEFORE INSTALLATION, CHECK BOLTS AT THE BASE OF THE POSTS ARE NOT FULLY TIGHTENED TO ALLOW FOR EASY BOLT HOLE ALIGNMENT. Route Communication Wire with Coupler through Display Port and install the Rear Cross Brace. Rear Cross Brace with Display Port (rear view)
  • Page 14 POWER RACK ASSEMBLY INSTRUCTIONS SET FRONT POSTS IMPORTANT: DO NOT TIGHTEN BOLTS UNTIL FINAL INSTALLATION. PARTS MUST BE ABLE TO ADJUST FOR EASY BOLT HOLE ALIGNMENT. Short end facing Power Module RIGHT FRONT POST LEFT FRONT POST Decals face inward...
  • Page 15 POWER RACK ASSEMBLY INSTRUCTIONS INSTALL FRONT CROSS BRACE IMPORTANT: BEFORE INSTALLATION, CHECK BOLTS AT THE BASE OF THE POSTS ARE NOT FULLY TIGHTENED TO ALLOW FOR EASY BOLT HOLE ALIGNMENT. Suspension Trainer Hook face inward IMPORTANT: DO NOT TIGHTEN BOLTS TO ALLOW FOR EASY BOLT HOLE ALIGNMENT.
  • Page 16 POWER RACK ASSEMBLY INSTRUCTIONS INSTALL TOP FRAMES IMPORTANT: BEFORE INSTALLATION, CHECK BOLTS AT ALL POST CONNECTION POINTS ARE NOT FULLY TIGHTENED TO ALLOW FOR EASY BOLT HOLE ALIGNMENT. IMPORTANT: DO NOT TIGHTEN BOLTS TO ALLOW FOR EASY BOLT HOLE ALIGNMENT. IMPORTANT: DO NOT TIGHTEN BOLTS TO ALLOW FOR EASY BOLT HOLE ALIGNMENT.
  • Page 17 POWER RACK ASSEMBLY INSTRUCTIONS INSTALL WEIGHT STACK IMPORTANT: BEFORE INSTALLATION, CHECK BOLTS AT ALL POST CONNECTION POINTS ARE NOT FULLY TIGHTENED TO ALLOW FOR EASY BOLT HOLE ALIGNMENT.
  • Page 18 POWER RACK ASSEMBLY INSTRUCTIONS FINAL ASSEMBLY     IMPORTANT: PROPERLY TIGHTENED ALL BOLTS. TORQUE SPECIFICATION 3/8-16 IN. (FRAME BOLTS): 25 ft-lbs (34 Nm) Reference Step 5 through Step 10 for all frame bolt locations. 3110 Power Rack (3111 model similar) Set Bar Catches, Spotting Bars, and Barbell Attachments.
  • Page 19: Final Installation Checklist

    Figure 6. Air System Setup Reference WARNING: Never connect Keiser pneumatic equipment to an air source that is capable of exceeding 120 psi / 8.27 bar. Over pressurizing Keiser pneumatic equipment may cause tubing to burst, breakage of equipment, abnormal operation, or serious injury.
  • Page 20: Keiser Corporation 2470 S. Cherry Ave

    POWER RACK ASSEMBLY INSTRUCTIONS CUSTOMER SUPPORT If you have any questions regarding the Assembly Instructions after reading this guide, contact Keiser Customer Support: KEISER CORPORATION 1 559 256 8000 2470 S. Cherry Ave. service@keiser.com Fresno, CA 93706 keiser.com/support 315502_A...

This manual is also suitable for:

3111 series

Table of Contents