UPS5000-E-(400 kVA-600 kVA)
User Manual (60 kVA Power Modules)
Contents
2.4 Typical Configurations......................................................................................................................................................... 49
2.4.1 Single UPS............................................................................................................................................................................ 50
2.4.2 Parallel System................................................................................................................................................................... 50
2.4.3 Dual-Bus System................................................................................................................................................................ 51
2.5 Optional Components......................................................................................................................................................... 51
3 Installation..............................................................................................................................53
3.1 Installation Preparations.................................................................................................................................................... 53
3.1.1 Site.......................................................................................................................................................................................... 53
3.1.1.1 UPS Dimensions............................................................................................................................................................. 53
3.1.1.2 Installation Environment............................................................................................................................................. 54
3.1.1.3 Clearances......................................................................................................................................................................... 54
3.1.2 Tools and Instruments..................................................................................................................................................... 55
3.1.3 Preparing Power Cables.................................................................................................................................................. 57
3.1.4 Unpacking............................................................................................................................................................................ 61
3.2 Single UPS Installation........................................................................................................................................................ 62
3.2.1 Installing a UPS.................................................................................................................................................................. 62
3.2.1.1 Installation on the Floor.............................................................................................................................................. 62
3.2.2 Installing Batteries............................................................................................................................................................ 67
3.2.5 Routing Cables................................................................................................................................................................... 70
3.2.5.1 Top Cable Routing......................................................................................................................................................... 70
3.2.5.2 Bottom Cable Routing.................................................................................................................................................. 81
3.2.7 TN-C System Application................................................................................................................................................ 89
3.3 Parallel System Installation............................................................................................................................................... 90
3.3.1 Connecting Power Cables............................................................................................................................................... 91
3.3.2 Connecting Signal Cables............................................................................................................................................... 94
3.4 Verifying the Installation.................................................................................................................................................... 96
4 Operations............................................................................................................................ 100
4.1.1 Power-On........................................................................................................................................................................... 100
4.1.2 Initial Startup.................................................................................................................................................................... 101
4.1.3 Starting the Inverter.......................................................................................................................................................103
4.1.4 Powering On Loads........................................................................................................................................................ 105
Issue 07 (2022-06-20)
Copyright © Huawei Digital Power Technologies Co., Ltd.
v