1.3.3

Verify Successful Software Upload

1. Configure the PUMP utility "Communication Setup" as shown in the figure below.
2. In the PUMP utility, click on the "Connect" button. Verify the PUMP utility connects to the
UUT.
3. In the PUMP utility, click on the "Communicate" button. Verify a text window with a
"cmd:" prompt appears.
At the "cmd:" prompt type 1,S,E and press <ENTER> to enable true colors. Verify a reply
of "true colors enabled".
4. Exit out of the "Communicate" window.
5. In the PUMP utility, click on the "Communication Setup" button. Change the "Baud Rate"
to 115200 and exit.
6. In the PUMP utility, click on the "Connect" button. Verify the PUMP utility connects to the
UUT.
7. In the PUMP utility, click on the "Communicate" button. Verify a text window with a
"cmd:" prompt appears.
At the "cmd:" prompt type V and press <ENTER> to verify the revision level of the
application and bootloader loaded on the UUT. Verify a reply of 9VA88-X; 9VA87-X,
where X is the software revision.
The version of the 9VA88 software should match the version just loaded. This completes
the procedure.
OBE-00-22-01
Version No.: A.1

Figure 1-19 Communication Setup Window

1-15
Q3920 EOT 3G TO 4G CONVERSION
JANUARY 2022

Advertisement

Table of Contents
loading

Table of Contents