Operation; Checklist Before Operation - Redx RX Series User Manual

Hide thumbs Also See for RX Series:
Table of Contents

Advertisement

1
DRM0_1

6 Operation

6.1 Checklist before operation

1. Check whether the system is firmly installed, and the installation position is suitable for operation
and maintenance.
2. All cables are correctly connected, properly distributed, and well protected, and no mechanical
damage is present.
3. The selection of AC circuit breakers is correct.
4. The wiring terminals are securely installed, and the vacant terminals are sealed.
5. All safety signs and warning labels on the system are firmly and clearly visible
Rev 20220606
Figure 5-13 - DRM cable assembly
Figure 5-14 - DRM RJ45 pins
Table 5-6 - DRM pins detail
2
3
DRM0_2
N/A
4
5
N/A
N/A
N/A
RX2505AC
6
7
8
N/A
N/A
.
Page 24 of 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx-2505ac

Table of Contents