Installation and operation manual Table of Contents 1 Introduction 1.1 Read this first 1.2 Target Audience 1.3 Product versions covered by this document 2 Preparation Safety instructions 2.2 Package contents 2.3 Internal DC switch 2.4 Explanations of symbols on inverter 3 Product information 3.1 Overview 3.2 Product identification...
This manual contains important information for use during installation and maintenance of the series Autarco inverter. To reduce the risk of electrical shock, and to ensure the safe installation and operation of the series Autarco inverters, the following safety symbols appear throughout this document to indicate dangerous conditions and important safety instructions.
1.3 Product versions covered by this document The main purpose of this user manual is to provide instructions and detailed procedures for installing, operating, maintaining, and troubleshooting the series of Autarco inverters which includes the following models: ● S2.LH5000 ●...
Please contact your dealer to get the information of authorized repair facility for any maintenance or repairmen. Any unauthorized actions including modification of product functionality of any form will affect the validation of warranty service; Autarco may deny the obligation of warranty service accordingly. M-S2-LH.1-EN-V2.1...
Page 8
WARNING! The RHI series does not support parallel (three- and single-phase) operation on the AC-BACKUP port. Parallel operation of the unit will void the warranty. WARNING! Please refer to the specification of the battery before configuration. LH-series Inverters...
2.3 Internal DC switch Please verify whether your Autarco LH series inverter is equipped with internal DC switches. This switch can be found on the bottom of the inverter. If there isn’t an internal DC switch it is important to apply an external DC disconnector in order to completely disconnect the solar PV module strings from the inverter.
3.1 Overview Autarco LH series hybrid nverters are state of the art, high efficiency, robust and reliable grid tied inverters at the best price quality ratio available. They are easy to install and carry a standard 5 year product warranty which is extendable to 15 years.
Page 12
Front view Bottom view LH-series Inverters...
Page 13
Installation and operation manual M-S2-LH.1-EN-V2.1...
Installation 4.1 Safety DANGER! Do not install the inverter near flammable or explosive items. WARNING! The installation must be performed by qualified personnel and in compliance with national and local standards and regulations. This inverter will be connected to a high voltage DC power generator and AC grid. Inappropriate installation may also jeopardize the life span of the inverter.
Installation and operation manual 4.3 Mounting instructions Two people are required to remove the inverter from the carton and install the inverter. Handles are formed into the heatsink for ease of handling the inverter. ● The inverter is suitable for outdoor and indoor installation. ●...
4.4 Safety clearance CAUTION! Make sure heat sinks are out of reach of children. WARNING! When installing multiple inverters, make sure there is sufficient clearance between them. High temperatures may affect performance. Make sure inverter controls are reachable in case of emergency. Observe the following minimum clearances to walls and other inverters.
Installation and operation manual 4.5 Mounting procedure Step 1 — Mount the wall bracket onto the mounting wall with appropriate screws plugs Step 2 — Lower the inverter onto the bracket Step 3 — Use screws in the package to fix the bottom of the inverter to the mounting bracket M-S2-LH.1-EN-V2.1...
WARNING! No matter what kind of grounding connection is adopted, it is strictly forbidden to connect the ground of the inverter with the lightning protection of a building, otherwise Autarco will not be responsible for any damage caused by lightning.
Page 19
Installation and operation manual IMPORTANT! B (insulation stripping length) is 2-3mm longer than A (OT cable terminal crimping area) Insert the stripped wire into the OT terminal crimping area, and use an hydraulic clamp-tool to crimp the terminal to the wire (as shown in Figure 5.8). IMPORTANT! After crimping the terminal to the wire, inspect the connection to ensure the terminal is solidly crimped to the wire.
IMPORTANT! In order to improve the corrosion resistance of the grounding terminal, we recommend that the external grounding terminal is coated with silica gel or paint for protection after installation of the grounding cable. 5.2 AC connection DANGER! Never connect or disconnect the connectors under load. NOTICE! The AC connection to the electrical distribution grid must be performed only after receiving authorization from the utility that operates the grid.
Page 21
Installation and operation manual Description Numerical Value Wire Diameter 13-25 mm Traverse cross sectional area 6-13 mm2 (10-6AWG) Exposure Length 13 mm Inside the AC-connector ‘’L1’’, ‘’L2’’, ‘’L3’’, ‘’N’’ and ‘’PE’’ are printed next to the port. The 3 live wires are connected to L1, L2 and L3 terminals respectively.
Page 22
are e.g.: nominal AC current, type of cable, type of routing, cable bundling, ambient temperature and maximum specified line losses. The steps to assemble AC grid terminal connector are listed as follows: Step 1 — Strip the outer jacket 70mm and strip off each cable isolation for about 13 mm. Put the cable through the nut and sleeve of the socket element, insert corresponding terminals and tighten with Allen wrench.
Installation and operation manual NOTICE! It is important that the AC wires are connected to the right terminals as indicated by the “L1”, ‘’L2’’, ‘’L3’’, “N” and “Ground” symbols on each AC connector. Damage to the inverter by wrong connections are not covered under warranty !. In some countries a second protective conductor is required.
Page 24
The Autarco LH series inverter uses RS485 cable to communicate with the Meter and the CAN-bus to communicate with the battery's Battery Management System (BMS). The image below shows the assembly of the RS485/CAN communication cables. LH-series Inverters...
Page 25
Installation and operation manual NOTE: The CAN cable enables the communication between the inverter and the Li-ion battery, please check for latest model compatibility before installation. Procedure for connecting the CAN-cable. 1. Take out the CAN cable (terminal marks ‘CAN' on one end and 'to Meter' on the other end). 2.
Page 26
NOTE: To use this function, please contact Autarco if this function is supported in your country. To protect the inverter's AC grid connection conductors, Autarco recommends installing breakers that will protect against overcurrent. The following table defines OPCD ratings for each model;...
“Manufacturer’s declaration for usage of residual current devices”. Contact Autarco for advice. 5.4 Communication cable assembly The Autarco LH series inverter has an integrated export power control function (PELD). To let this function work, you need to connect a 3-Phase power meter for export power control.
DANGER! Do not connect the strings with an open circuit voltage greater than the Max DC voltage of the inverter. DANGER! For protection against electric shock, MC4 connectors must be isolated from the PV array while being assembled or disassembled. DC connections must not be unplugged while under load.
Installation and operation manual 5.7 Status LED indicators There are three LED status indicator lights at the front panel of series inverters. The left POWER light (red) indicates power status of the inverter. The middle OPERATION light (green) indicates the operation status. The right ALARM light (yellow) indicates the alarm status.
3 minutes the inverter will start normal operation with the inverter display showing GENERATING. 5.8 Inverter monitoring The inverter can be monitored via Wi-Fi or GPRS. All Autarco communication devices are optional. For connection instructions, please refer to the Autarco Monitoring Device installation manuals.
Page 31
Installation and operation manual Turn ON inverter Turn OFF inverter 1. Connect AC side and AC- back-up 1. Switch OFF the AC switch 2. Select grid standard 2. Switch OFF the DC switches 3. Configure all parameters 4. Check polarity of the battery and turn on its DC-switch 5.
Operation 6.1 LED indicator lights There are three LED status indicator lights in the front panel of Autarco xxxx series inverters. The left POWER light (red) indicates power status of the inverter. The middle OPERATION light (green) indicates the operation status.
Installation and operation manual 6.3 Information In the information section, operating data and information data can be viewed. Sub-sections include: ● General info ● System info ● Energy Records ● PV Energy records ● BMS Info ● Meter info Examples of displayed values are shown in the following figures. Values are for reference only. Each value is displayed for 10 seconds.
Page 34
General Information LH-series Inverters...
Page 35
Installation and operation manual System Information Energy records M-S2-LH.1-EN-V2.1...
Page 36
PV Energy records BMS Information LH-series Inverters...
Page 37
Installation and operation manual BMS Information M-S2-LH.1-EN-V2.1...
Meter Information 6.4 Settings The following options are available under the Settings submenu: Press UP/DOWN keys to set change element Set Time and Date Press ENTER key to move to next element Press ESC key to save date and return Assign a number (##) to the inverter to distinguish between multiple inverters when using parallel communication with WIFI-BOX or GPRS-BOX Set Address...
6.5 Advanced info WARNING! Access to this section of the menu is for Autarco qualified and accredited technicians only. Unauthorized access will void the product and system warranty. Screen can be scrolled through with UP/DOWN keys to see the information as per the table below. Press ENTER key to enter a submenu.
All the historical energy generation records can be easily viewed in this section. 6.6 Advanced Settings WARNING! Access to this section of the menu is for Autarco qualified and accredited technicians only. Unauthorized access will void the product warranty and any kWh Guarantee.
Page 41
Installation and operation manual WARNING! Set GRID ON (see below) before new standard is activated. WARNING! Please note that the User-Def standard is not to be used without the agreement of the local grid authority. Press UP/DOWN keys to cycle through grid ON/OFF options Grid ON/OFF Press ENTER key to save Press ESC key to return...
Page 42
Default is AUTO: this mode is not shown and cannot be selected This mode uses the following logic: store excess PV energy into the battery and use it to support loads instead of exporting to the grid. (maximise self-consumption) To change back to default mode, set option 2 and 3 to OFF. Time-charging: Customer can define the charge/discharge current as well as the time when to charge/discharge the battery.
Page 43
Installation and operation manual 1. EPM ON/OFF: enable /disable PELD-function 2. Backflow power: set the maximum allowed power to feed into grid 3. Failsafe ON/OFF Setting 2 and 3 are only valid when setting 1 is ON When the Failsafe function is ON, the inverter will shutdown if it loses communication with the meter to avoid backflow power exceeds the limit.
6.7 Temperature derating The output power of the inverter varies with ambient temperature, as shown in the figure below. Maintenance CAUTION! Do not touch the heat sink when the inverter is in operation. Turn OFF the inverter (see section 5.5) and allow for cooling down before cleaning or maintenance. CAUTION! Never use any solvents, abrasives or corrosive materials to clean the inverter.
Page 45
Installation and operation manual Troubleshooting 9.1 General Display Action message ● Check that all switches are in the ON position (including internal DC switch if present) ● Blank screen Check AC, back-up AC and DC power supply. ● If switches are on and AC and/or DC power supply is available please contact installer. M-S2-LH.1-EN-V2.1...
Page 47
Installation and operation manual If the inverter displays any alarm message as listed above: please turn off the inverter and wait 5 minutes before restarting it. If the fault persists, contact your installer or Autarco. Have the following information available:...
Page 48
10 Product specifications S2.LH5000 S2.LH6000 S2.LH8000 S2.LH10000 Input Max. DC voltage (V) 1000 MPPT voltage range (V) 200-850 Turn on voltage (V) Full load MPPT range (V) 200-850 Number of MPP trackers Max. DC current per MPPT (A) 26/13 Number of DC connections per MPPT Total number of strings DC connection type...
Page 49
Installation and operation manual Harmonic distortion at nom. output (THDI <2% Output AC backup Peak output power (VA) 10 kVA, 60 sec 12 kVA, 60 sec 16 kVA, 60 sec 16 kVA, 60 sec Back-up switch time (sec) < 40 ms Rated output voltage (V) 3P/NE/PE (Three phase 380 /400 ) Rated frequency (Hz)
Page 50
Type of inverter Transformerless Self consumption (night) (W) < 7 W Mounting Wall bracket Operating temperature range (°C) -25°C to 60°C Relative humidity 0-100% Maximum altitude 4000m IP protection rating IP65 according to EN60529 Isolation type Transformerless Cooling concept Natural convection Noise level (dB) <...
Need help?
Do you have a question about the LH Series and is the answer not in the manual?
Questions and answers