Always follow the material manufacturer's instructions
for the material being sprayed. Material must be
thoroughly mixed to a smooth consistency before
loading it in the hopper.
NOTE: For stucco base and base coats, it is
NOTE:
NOTE:
recommended to use a standard 8 oz. x 4 in. steel
plumb bob (not provided) as a gauge for material
pumpability. With the tip of the plumb bob barely
touching the material, let the plumb bob drop into the
material. If the plumb bob sinks 3/4 of the way or
more, the material is a sufficient consistency.
Managing Material
Material After
After Mixing:
Mixing:
Managing
Managing
Material
After
Mixing:
1. Pay close attention to the work life of the material
being used.
2. Only mix the material kits as needed. Do not let
mixed material sit longer than necessary.
3. Scrape material down the sides of the hopper as
the hopper material level lowers. Do not let older
material cure on the walls.
4. To ensure that all material in the hopper is used
while fresh, occasionally wait until the hopper is
almost empty before refilling.
3A3437F
All manuals and user guides at all-guides.com
Prime with
Prime
Prime
with Material
with
Material
Material
NOTICE
NOTICE
NOTICE
Loading material into a dry system will cause the material
to stick to internal components and cure, causing
damage and requiring replacement of those parts. To
prevent material curing in system, never load material
into a dry system.
The applicator must be removed before priming.
Always push out any remaining water into a waste
container before circulating material. Always circulate
clean material back into the hopper for several cycles
before beginning to spray.
1. Prime the system with water. See
Prime with Water, page
2. Mix the material. See
3. Turn the flow adjustment knob (H)
counterclockwise until it stops.
4. Remove the applicator.
5. Fill the clean hopper with material to be sprayed.
6. Place the hose outlet in a waste container.
7. Turn the motor power switch (S) to ON.
8. Turn the flow adjustment knob (H) clockwise
slowly to increase pressure until water is purged
out and a steady stream of material flows from
the applicator.
NOTICE
NOTICE
NOTICE
To prevent damage to pump seals caused by
cavitation, run the pump slowly until the system is
primed.
9. To stop dispensing, turn adjustment knob (H)
counterclockwise until it stops.
10. Install applicator.
NOTE:
NOTE: For EIFS finish coats, before installing the
NOTE:
applicator, prime the larger ID hose, then install
and prime the transition fitting and whip hose.
11. Recirculate several cycles of material to make
sure the material is flowing properly.
12. Turn the flow adjustment knob (H)
counterclockwise to stop the pump.
13. Install the air line and a tip onto the applicator
(see applicator manual). The system is now
primed and ready to spray.

Mix the Material

16.
Mix the Material, page
17.
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

25a30025a30225c61025c61225a30425a306

Table of Contents