Trial Operation - Mitsubishi Electric AH-1006S-E Operating And Installation Instructions

Air conducting fan
Table of Contents

Advertisement

Installation of Main Unit (Continued)
■ AH-3009S-E
When "High-Low" operation is selected:
Control Switch
(not supplied)
N
Power supply
220-240V ~50Hz
220V ~60Hz
L
ON/OFF
When "High" or "Low" fixed operation is selected:
"High" operation
Switch
(commercially available)
Power supply
220-240V ~50Hz
220V ~60Hz
ON/OFF
"Low" operation
Switch
(commercially available)
Power supply
220-240V ~50Hz
220V ~60Hz
ON/OFF
* Connect the power supply cable securely
according to local rules and regulations.
Examples in Japan

Trial Operation

After completing installation, check that every wire is connected properly, the product operates
properly, and the main unit is installed securely and does not produce vibration or abnormal noises.
Should any trouble be found, it must be immediately corrected.
Please explain correct manner of operation with the presence of the user (customer).
Power cord
GREEN/
YELLOW
BLUE
FANS
BLACK
HIGH/LOW
BROWN
Second unit
Power cord
GREEN/
YELLOW
BLUE
FANS
BLACK
BROWN
Power cord
GREEN/
YELLOW
BLUE
FANS
BLACK
BROWN
Insulation
Sleeve
Instruction Maual
Report No. 295976 (6 of 7 pages)
Shifting the Terminal block to the Right
Side (AH-1006S-E, AH-1509S-E, AH-
2009S-E)
If the terminal block is desired to relocate on the
right side of the main unit, perform as follows
before mounting the main unit on the ceiling.
1. Remove the terminal cover. Rotate the
mounting plate 180°and re-secure it.
2. Turn the main unit upside down and fit the
terminal cover in place.
6
Remove the
terminal cover
Rotate the mounting
plate 180°
Turn the main unit

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ah-1509s-eAh-2009s-eAh-3009s-e

Table of Contents