Download Print this page

Check Points After Installation Work; Trial Operation - Mitsubishi Electric Lossnay LGH-150RVXT-E Installation Instructions Manual

Energy recovery ventilator
Hide thumbs Also See for Lossnay LGH-150RVXT-E:

Advertisement

Check points after installation work

Trial operation

1. Trial operation using the remote controllers (PZ-61DR-E)
Follow the procedure shown in the operation manual for the remote controller the functions below.
2. Lossnay trial operation
This function can be used following situations.
Terminal DIP-SW
Setting
-
-
-
-
TM3 70 SW5-6 OFF
ON
TM3 90
OFF/OFF
SW5-2
OFF/ON
ON/OFF or
ON/ON
TM3 80
-
Error code "0900" appears on the remote controller.
3. Complete system trial operation
Interlock system containing an indoor unit and/or external device
interlocked.
If MELANS System
Eng-22
Minutes
Seconds
-
FanSpeed
-
Ventilation mode
Bypass monitor output
Pre-heater output
EA fan monitor output
SA fan monitor output
SA fan monitor output delay
operation
-
Malfunction monitor output
0
1
0 10 20 30 40 50 0 10 20 30 40 50 0 10 20 30 40 50 0 10 20 30 40 50 0 10 20 30 40 50
STOP
4
STOP
4
Bypass
Lossnay
OFF
ON
OFF
OFF
ON
ON
OFF
ON
2
3
ON
4
ON

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lossnay lgh-200rvxt-eLossnay lgh-250rvxt-e