Bunn Ultra NX Installation & Operating Manual page 7

Table of Contents

Advertisement

9
9. Thoroughly rinse the Hoppers
and install them over the
Augers and Cooling Drums.
12
12. To install one of the
Handles, start the right
side over the Pivot Pin.
15
15. Remove Protective Film on
Displays before installing.
18
18. Attach each of the Hopper
Lid Cords on the back of the
Hoppers.
INITIAL SETUP
10
10. Slide the Hoppers into place
and push down.
9 13
13. While slightly twisting the
Handle, spread the left side
over the left Pivot Pin to snap
into place.
16
16. Use slots on both sides of
each Lid to slide Displays (4)
into the fronts and backs of
both Lids.
NOTE: When ready to fill with
product, lift slightly and slide back
until the two notches in the bottom
of lid touch the back of the hopper.
7
11
11. The Hoppers are seated
correctly when the Lock
Plunger snaps into place
and sticks out.
14
14. Install Level Probes at the
top rear of the Hoppers.
17
17. Set Lids on the Hoppers.
19
19. Assemble Drip Tray and
slide onto metal extensions
from base.

Advertisement

Table of Contents
loading

Table of Contents