Bunn Ultra NX Installation & Operating Manual page 19

Table of Contents

Advertisement

Assembly After Cleaning (continued)
7
7. Install Hoppers over the
Augers and Cooling Drums.
10
11
10. Place Spring and Seal in
Faucet Valve.
11. Carefully slide Faucet
Valve Assembly into place
on the Hopper.
14
14. Install Level Probes at the
top rear of the Hoppers.
16
17
16. Use dry, cotton cloth to clean
magnetic contacts on Hopper
Lid Cords.
17. Attach each of the Lid Cords
on the back of the Hoppers.
CLEANING
8
8. Slide the Hoppers into place
and push down.
12
12. Install a Handle by starting
the right side over the right
Pivot Pin.
15
15. Set Lids on the Hoppers.
18
18. Assemble Drip Tray and
slide onto metal extensions
from base.
19
9
9. The Hoppers are seated when
the Lock Plunger snaps into
place and sticks out.
13
13. While slightly twisting the
Handle, spread the left side
over the left Pivot Pin to snap
into place.
NOTE: If this is an Autofill unit,
slide the Hopper Fitting into
place in the slot on the Hopper.
19
I
O
10:45:30 AM
ICE
ICE
19. Turn ON Augers and cooling
function to desired settings.

Advertisement

Table of Contents
loading

Table of Contents