Summary of Contents for Hagie SmarTrax 2100 Series

  • Page 1 Hagie 2100/2101 Series SmarTrax™ Installation Manual P/N 016-0190-057 Rev A 01-16 Copyright 2009, 2016...
  • Page 2 Disclaimer While every effort has been made to ensure the accuracy of this document, Raven Industries assumes no responsibility for omissions and errors. Nor is any liability assumed for damages resulting from the use of information contained herein. Raven Industries shall not be held responsible or liable for the effects of atmospheric conditions and sunspot activity on the performance of our products.
  • Page 3: Table Of Contents

    016-0190-057 TABLE OF CONTENTS 03/05 SMARTRAX STEERING INSTALLATION ..................2 MOUNTING UNIVERSAL BRACKET ....................3 INSTALLING TANK, EXCESS FLOW, LEFT AND RIGHT STEER LINES ........4 INSTALLING PRESSURE LINE ......................5 MOUNTING THE STEERING POSITION SENSOR (S.P.S.) ............. 6 CABLE ROUTING ..........................7 START-UP PROCEDURES ........................
  • Page 4: Smartrax Steering Installation

    Hagie 2100/2101 SMARTRAX STEERING INSTALLATION To begin installation, remove steel grating from bottom of machine. Remove #8 JIC (M) port from “P” port on Raven Hydraulic Valve. Replace with supplied #6 JIC (M) to #8 SAE o-ring fitting. Attach pressure switch to “PS” port on hydraulic block using only the straight fitting.
  • Page 5: Mounting Universal Bracket

    MOUNTING UNIVERSAL BRACKET Universal bracket mounts to frame rail on right side of machine between cab and engine. Bracket must be welded to frame. Mount valve loosely to bracket to assure proper clearance around valve. Weld bracket to frame. Mount valve to bracket. NOTE: Cover existing wires and hoses below welding area.
  • Page 6: Installing Tank, Excess Flow, Left And Right Steer Lines

    INSTALLING TANK, EXCESS FLOW, LEFT AND RIGHT STEER LINES Remove existing tank, pressure, left, and right lines from orbital. Install #6 JIC run tees onto tank, left, and right ports. Re-attach original tank, left, and right hoses to run end of tee. NOTE: Ports are labeled on orbital.
  • Page 7: Installing Pressure Line

    Tank Left Right Attach excess flow hose to “EF” port on top of Raven valve using supplied 90 #8 JIC fitting. Attach tank hose to “T” port. Attach left steer hose to “A” port. Attach right steer hose to “B” port. Original Pressure E x c e s s Hose...
  • Page 8: Mounting The Steering Position Sensor (S

    MOUNTING STEERING POSITION SENSOR (S.P.S.) The SPS mounts on right side steering cylinder Supplied mounting tab must be welded to support bracket at base end of cylinder. Install bolt in tab and tighten before welding. Bracket must be made to mount other end of SPS.
  • Page 9: Cable Routing

    CABLE ROUTING Access Hole Connect wire harness to SPS, left and right valve coils, and pressure switch. Left coil is outer one, right coil is inner one. Run harness into cab through access hole at right rear of floor cab. START-UP PROCEDURES Check the S.P.S.
  • Page 11 RAVEN INDUSTRIES Limited Warranty What Does this Warranty Cover? This warranty covers all defects in workmanship or materials in your Raven Applied Technology Product under normal use, maintenance, and service. How Long is the Coverage Period? Raven Applied Technology Products are covered by this warranty for 12 months after the date of purchase.

This manual is also suitable for:

Smartrax 2101 series