Checks
Calling up licence information for the integral...
5 Contact information
Viessmann Climate Solution SE
D-35108 Allendorf
Germany
Fax +49 64 52 70-27 80
Phone +49 64 52 70-0
open-source-software-support@viessmann.com
www.viessmann.de
Calling up licence information for the integral communication module TCU300
Calling up the licence information requires a WiFi-ena-
bled mobile device, e.g. a smartphone or a PC. Carry
out the following steps:
1. Connect the heat pump to the WiFi router: See
page 37.
2. Call up the IP address assigned to the heat pump
in the WiFi network: See following chapter "Calling
up the heat pump IP address".
Calling up the heat pump IP address
Tap the following buttons:
1.
Screed drying
For screed drying, e.g. in a new build, your contractor
can activate the "Screed drying" function. The screed
will be dried in line with a set time program suitable for
the building material (temperature:time profile).
Room heating for all heating/cooling circuits takes
■
place according to a set time program. Your settings
for room heating/room cooling have no effect for the
duration of screed drying.
DHW heating is active.
■
Calling up screed drying for all heating/cooling cir-
cuits
Tap the following buttons:
1.
Checking service messages
Your contractor can set service intervals. When these
service intervals are exceeded, a service message is
displayed automatically: "Service" and
42
(cont.)
3. Connect your mobile device to the same WiFi net-
work as the heat pump.
4. In your device's internet browser, enter the heat
pump IP address determined in step 2.
The required licence information is displayed.
2.
"Information"
3.
Internet
2.
"Information"
3. "Heating/cooling circuit 1" to "Heating/cooling
circuit 4"
4. "Operating program"
Screed drying lasts up to 32 days. The value displayed
for "Screed drying days" is the number of days
remaining.
If available, your heating contractor's contact details
will be displayed.