Commissioning; Instructions For Commissioning; Operation; Faults - iDM AERO SLM 3-11 Technical Documentation Installation Instructions

Additional model: hgl without hgl with navigator 2.0 control air heat pump with inverter-technology
Table of Contents

Advertisement

8 . 1. In str ucti on s f or c om m is s ion in g
Before commissioning AERO SLM heat pumps, the
heating side must be checked for tightness, rinsed
thoroughly, fi lled and bled carefully. During transport it
can happen that threaded connections can be loosen
inside the heat pump by vibrations. To avoid dama-
ges on the heat pump and the installation area, it is
absolutely necessary that all pipe connections inside
the heat pump are tighten. Please check this during

commissioning.

Commissioning requirements:
- The heating and any storage tank must be fi lled and
bled.
- The screwing must be checked for tightness during
commissioning.
- The electrical installation must be complete and
fuse-protected in line with legal requirements.
- The heat pump may only be switched on if it is fi lled
on the refrigerant side and on the heating side, and
if the electrical connections has been checked.
- During commissioning, the fl ow temperatures must
also be set. The shut-off point 62°C (with refrigerant
R410A) should be checked and the set shut-off
temperature changed if necessary.
- If the heat pump is to be drained on the heating
side, the connection hose on the heat pump return
must be disconnected.
- At air source heat pumps a heating buff er tempe-
rature of min. 20°C must be guaranteed in order to
ensure the required temperature for the reference
defrosting.
(C) IDM ENERGIESYSTEME GMBH
8. 2 . Op er at i o n
The AERO SLM is switched on and off automatically
via the fully automated NAVIGATOR 2.0. For opera-
ting and commissioning, see the separate operating
and commissioning instructions.
Annual inspection and maintenance of the system by
customer services is recommended, in particular with
regard to preserving warranty claims.
8. 3 . Fau lt s
The AERO SLM is fi tted with various safety devices
so that no damage can be caused to the equipment in
the event of faults. If the heat pump does not run, ple-
ase check the fault message which will be displayed
on the NAVIGATOR 2.0 control display. For more
information, please see the NAVIGATOR 2.0 control
operating instructions.
If an error occurs several times in succes-
sion, please contact your relevant iDM
customer service department.
Customer service telephone:
__________________________________
Before the front part is removed for main-
tenance or repair work, it must be ensured
that the device is voltage free.
Installation instructions AERO SLM
8. Commissioning
commissioning
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aero slm 6-17

Table of Contents