Installation Of Connecting Hoses - iDM AERO SLM 3-11 Technical Documentation Installation Instructions

Additional model: hgl without hgl with navigator 2.0 control air heat pump with inverter-technology
Table of Contents

Advertisement

5 . 2. In sta ll ati on of c on n e c t i n g h os e s
The connecting hoses for the heat source- and hea-
ting side for the AERO SLM are connected inside of
the heat pump and lead through the designated ope-
nings either on the right or left side. With the AERO
SLM 6-17 this is only possible on the left side.
To remove the front panel, the interlocking device
must be opened with a screw driver or a pointed ob-
ject. The interlocking device is behind the white cover,
around one centimeter above the edge of the unit. By
pressing the locking bolt, the lock of the front panel
will be released.The front panel can be unhinged out
by gently lift up.
Before the front part is removed for mainte-
nance or repair work, please be sure that
the device is tensionless.
After the front panel is removed, the fi xing screws of
the side parts will be loosed.
The fi xing screws are located on the front as shown
in the photo below.
(C) IDM ENERGIESYSTEME GMBH
Depending on the where the connection hose to the
outside should be feed through, the perforation in the
housing has to be break out. The insulation has to be
cut out with a sharp knife.
In the scope of delivery are rubber grommets. The
rubber grommets will be cut in crosswise.
The rubber grommets may only be cut in
crosswise and not cut out completely.
Then the grommets are mounted in the bushing du-
ring the installation of the connecting hoses.
Installation instructions AERO SLM
assembly and hydraulic installation
Break out the perforation
Cut out the insulation
Cut in the rubber gromments
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aero slm 6-17

Table of Contents