CPI 1194 Series Assembly Manual page 14

Table of Contents

Advertisement

CPI Satcom & Antenna Technologies
Top of Reflector
Cross Arm
(TOP)
[ 7,8,9 ]
4 places
Cross Arm
(BOTTOM)
[ 6 ]
Reflector Support Tube
STEP 13:
A). With a person on each side of the reflector,
lift the reflector up.
B). Position the reflector so that the 2 carriage
bolts (step 12) pass thru the two holes in
the top cross arm.
C). Loosely attach 1 / 2" hardware (items,7,8,9).
Note: the reflector is fully supported at
this time.
D). Insert the 2 remaining carriage bolts (item 6)
thru the two bottom reflector mounting
holes and thru holes in the bottom cross
arm
E). Secure with items: 7, 8 & 9.
F). Tighten all reflector mounting hardware per
torque specifications listed on page 6.
14
4096-394
1.8M SERIES 1194

Advertisement

Table of Contents
loading

Table of Contents