CPI 1194 Series Assembly Manual page 12

Table of Contents

Advertisement

CPI Satcom & Antenna Technologies
3/4" Nuts
Reflector Support
Tube
Large Tabs
1" Hardware
Elevation Rod
Elevation Block
1 / 2" Hardware
Elevation Block
Positioner
STEP 8:
A). Place the reflector support tube in between
the large tabs on the positioner as shown.
B). Line up the holes on the tabs with the
holes in the reflector support tube.
C). Secure the support tube to the positioner
with the 1" hardware.
STEP 9:
A). Loosen 3/4" nuts on elevation rod
to allow movement of the elevation
block.
B). Slide elevation block down the elevation
rod and position the block in between
the small tabs on the positioner so that
the holes in both block and tabs are
aligned.
STEP 10:
A). Secure elevation block to Positioner with
1 / 2" hardware set aside in step 7.
12
4096-394
1.8M SERIES 1194