Download Print this page
Goodwe SCB2000 User Manual

Goodwe SCB2000 User Manual

Solar communication box

Advertisement

Quick Links

User Manual
GoodWe Technologies Co., Ltd.
Solar Communication Box
No. 90 Zijin Rd., New District, Suzhou, 215011, China
SCB2000
www.goodwe.com
service@goodwe.com
V3.0-2022-01-25
340-00710-00
Local Contacts

Advertisement

loading
Need help?

Need help?

Do you have a question about the SCB2000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Goodwe SCB2000

  • Page 1 User Manual GoodWe Technologies Co., Ltd. Solar Communication Box No. 90 Zijin Rd., New District, Suzhou, 215011, China SCB2000 www.goodwe.com service@goodwe.com V3.0-2022-01-25 340-00710-00 Local Contacts...
  • Page 2: Maintenance And Troubleshooting

    1 Symbols ---------------------------------01 2 Safety and Warning ---------------------------------01 3 Mounting 3.1 Mounting Instruction ----------------------02 ----------------------02 3.2 Overview and Packaging ----------------------03 3.3 SCB Installation 4 System is running ---------------------------------08 5 Maintenance and troubleshooting ----------------------13 6 Technical Data ---------------------------------15 7 Relevant Certification ---------------------------------15...
  • Page 3: Safety And Warning

    • SCB2000 shall be installed at a location free from explosive hazardous media and free from gas and dust sufficient to corrode metals and destroy insulation. • SCB2000 parameters and warning signs must be clearly visible after installation.
  • Page 4 250mm • SCB2000 can be placed horizontally or installed vertically. 125mm • The SCB2000 must be installed vertical or with a backward tilt less 15°.No sidwways tilt is allowed.The connection 25mm area must point downwards.Refer to Figure 3.3.1-1. Hole size Figure3.3.2-1...
  • Page 5 (1)Voltage lnput Port(L1\L2\L3\PE) Input line voltage range:AC342-690V ; AC frequency:50/60HZ LAN SCB2000 uses this port when accessing a network cable;The access point is as shown in the "NET" position in the figure above. The description of bottom label inside SCB2000 is as follows...
  • Page 6 One SCB2000 should be set as the host (root node), and the other SCB2000 should be set as the slave (slave node). Please refer to 4.3 fiber switch configuration instructions for details 4 System is running 4.1 Ezlogger pro indicator light description...
  • Page 7 (2)lf the user has a static IP, it is necessary to switch SCB2000 to the static IP mode. That is, press the Reload key for about 10 seconds to reset and restart SCB2000,About 10 seconds after pressing the Reload button, the LED lights on the SCB2000 internal EzLogger Pro Panel will blink from rightto left and reset and restart.
  • Page 8 1.When the configuration is complete, unplug the network cable to the Ethernet port of the computer and 4.3.2 The gigabit network switch indicator lights are all defined as follows plug it into the router.At the same time can restore the computer's lP address and other parameters to the default Settings.
  • Page 9 Please contact the PLC communication supplier or goodwe board fault after sale SCB2000 for the maintenance of the whole machine, such as internal failure, please replace the whole machine. Note: when replacing 5CB2000, please power off the system...
  • Page 10: Technical Data

    6 Technical Data Model / Name SCB2000(Solar Communication Box) Power supply Input Power adapter AC110V~240V Voltage Range voltage input frequency range 50Hz/60Hz Voltage Range of lnput AC line AC342V ~690v Rated Power Consumption ≤18w power line with the inverter communication LAN/GPRS/ optical fiber...