Download Print this page

GBC BOILER 1-4 K Instruction Manual page 57

Advertisement

BOILER 1"-4" K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
Insert the electric drive device making sure that the key on its shaft fits the seat on the pinion placed into the
machine . After a successful positioning fix the flange screws.
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 – 25046 Cazzago San Martino (Bs) – Italia – Tel. + 39 030 7451154 – Fax. + 39 030 73 56 629
57

Advertisement

loading