Download Print this page

GBC BOILER 1-4 K Instruction Manual page 53

Advertisement

BOILER 1"-4" K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
After having supplied the pneumatic locking device with air, move the lever downward to move the locking
piston forward that must be 2mm inside from the end of the reduced guiding shaft as show in the picture here
below .
Select the correct locking jaws according to the ID of the pipe you need to work and place them in the shaft as
shown in the picture.
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 – 25046 Cazzago San Martino (Bs) – Italia – Tel. + 39 030 7451154 – Fax. + 39 030 73 56 629
53

Advertisement

loading