BOILER 1"-4" K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
Screw the locking device and fix it in position with the counter nut. As shown in the picture.
Plug the air supply tube.
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 – 25046 Cazzago San Martino (Bs) – Italia – Tel. + 39 030 7451154 – Fax. + 39 030 73 56 629
51