Download Print this page

GBC BOILER 1-4 K Instruction Manual page 42

Advertisement

BOILER 1"-4" K
Istruzioni originali—rev.2011—in accordo al 1.7.4 della direttiva macchine 2006/42/CE
Select the LOCKING JAWS according to the diameter of the pipe and install them on the expansion shaft as
shown in the picture.
After having supplied the pneumatic locking device with air, keep the locking jaws pressed with your hand and
move the lever upward to get the expansion shaft withdrawn in the machine.
If the assembling has been correctly executed the locking jaws should a little play in their seat.
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 – 25046 Cazzago San Martino (Bs) – Italia – Tel. + 39 030 7451154 – Fax. + 39 030 73 56 629
42

Advertisement

loading