Sewing Machine Installation; Cutting The Machine Table; Timing Of The Looper To The Needles; Angle And Height For Installing The Looper - KANSAI SPECIAL NC Series Parts List, Instructions

Industrial sewing machines
Table of Contents

Advertisement

【 3】 SEWING MACHINE INSTALLATION

3-1 Cutting the machine table

NC/J
series
3
【 4】 TIMING OF THE LOOPER TO THE NEEDLES

4-1 Angle and height for installing the looper

To obtain the proper angle and height, insert the looper fully into looper holder A and then
tighten screw B. The proper angle for the looper is 90º against feed direction.
Please don't be more than 90°.

4-2 Looper left-to-right movement

On 1 needle machines the point of the looper should be 0.5~0.8mm above the top of the
needle's eye when the looper moves to the center on the back side of the needles. Also, the
point of the looper should be 0~―0.3mm above the top of the needle's eye when the looper
moves to the right on the front side of the needles (see the illustration below). To adjust
the timing of the looper to the needles, remove the machine cover, loosen screws A on the
timing pulley (upper), and shift the timing pulley (upper) by turning the handwheel while
holding the timing pulley (upper) by hand.

4-3 Looper setting distance

The distance from the point of the looper to the center of
the needle bar should be the table below when the looper
is at its farthest position to the right.
adjustment, loosen screw C (see 5-1) on the looper
holder.
Looper setting
TYPE
distance(Amm)
NC1001J
3.8
NC1001SJ
5.0
To make this
NC/J
series
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nc1103-4gNc1001gjNc1001gsjNc1001gsjf

Table of Contents