Cisco NCS 540 Installation Manual page 41

Small density passive cooled routers
Hide thumbs Also See for NCS 540:
Table of Contents

Advertisement

Install the Cisco N540-6Z14S-SYS-D Routers
Figure 16: Install an SFP Module into an SFP Module Slot
5. Insert the cable connector into the SFP module.
Remove SFP Modules
To remove an SFP module from a module receptacle, follow these steps:
1. Attach an ESD-preventive wrist strap to your wrist and to a bare metal surface on the chassis.
2. Disconnect the cable from the SFP module, and insert a dust plug into the cable end.
3. Unlock and remove the SFP module, as shown in the following figure.
If the module has a bale-clasp latch, pull the bale out and down to eject the module. If the bale-clasp latch
is obstructed and you cannot use your index finger to open it, use a small, flat-blade screwdriver or other
long, narrow instrument to open the bale-clasp latch.
Cisco Network Convergence System 540 Passive Cooled Small Density Routers Hardware Installation Guide
Caut i o n
Do not remove the dust plugs from the fiber-optic SFP module port or the rubber caps from the
fiber-optic cable until you are ready to connect the cable. The plugs and caps protect the SFP
module ports and cables from contamination and ambient light. Store the dust plugs for later use.
Tip
For reattachment, note which cable connector plug is transmit (TX) and which is receive (RX).
Remove SFP Modules
35

Advertisement

Table of Contents
loading

Table of Contents