1MRK 505 400-UEN B
6.2.2.1
Details
IEC18000465 V1 EN-US
Figure 14: Settings/Breaker failure protection - Details (L0 system activated)
In the Details view, the neutral system L0 of BFP can be activated and configured per bay by
selecting the checkbox Active for L0:
•
The current level for the BFP L0 is set independently from the phase setting.
•
Instead of external wiring of a fourth current input (L0), I0 can be calculated internally by
setting I0 calculated. This setting is mandatory for bay units that do not have a separate
L0 current input for neutral current measurement or use a metering transformer.
•
By selecting the Connect phase start signals check box all logical start signals for the BFP
phase system will be used to initiate the timer of the BFP L0 function.
•
Time step t1 L0 drop-down list is used to set the timer t1-L0.
Distributed busbar protection REB500
Technical manual
For considerations on the different possibilities to connect the BFP L0 system,
Application Manual .
see the
© Copyright 2019 ABB. All rights reserved
Additional protection options
GUID-5C3D7734-70AD-41BB-ADD3-8D8075FC3B3F v1
14000028-IEC18000465-1-en.vsdx
Section 6
47