• For standpipe installations, install the analyzer in a location with 61 cm (2 ft) of free space above
the analyzer for the standpipe mounting.
• Install the analyzer near an open drain. Refer to local regulatory agency instructions for disposal.
3.2 Icons used in illustrations
Manufacturer
User supplied
Do steps in reverse
Look
Do not use tools
supplied parts
parts
order
3.3 Step 1: Air purge (optional)
Air purge may be necessary if the analyzer is installed in a location with high humidity and/or fumes
that cause corrosion. The air purge keeps positive pressure in the instrument with dry and clean air.
3
3
Supply clean, dry instrument-quality air at 0.003 m
/minute (0.1 ft
/minute) at 20 psig maximum.
3
Refer to the illustrated steps that follow. The
/
-inch quick-connect fitting and tubing is supplied by
8
the user.
8 English