Download Print this page

IMER SPIN 15 Manual page 6

115v 60hz

Advertisement

-CAUTION! Before lifting the mixer, always check that all ma-
chine components are correctly secured and fitted in place
and no objects have been left on the surface
- CAUTION! Lift with care to avoid hazardous oscillations
- CAUTION! Never use points other than as specified in figure
3 to lift the machine
To lift the machine, use the four specific attachment rings (fig.3).
IMER INTERNATIONAL S.p.A.
SPIN 15
8. INSTALLATION
Position the mixer on a flat surface in a suitably ventilated envi-
ronment where it does not constitute an obstruction either during
use or cleaning at the end of the work shift.
- Position the mixer on a flat surface or slightly inclined towards
the material outlet.
9. CONNECTIONS
9.1 ELECTRICAL CONNECTION (see fig.5)
and electrical connection (socket, fuses, cable) correspond
to specifications in table 1.
The electrical power socket must be fitted with protection against
current overload (e.g. by means of fuses or a thermal magnetic
cut-out) and against dispersion current to earth (e.g. with a dif-
ferential circuit breaker). The electric cable wire size must take
into account the operating currents and length of the line to avoid
excessive voltage drops.
Avoid use of extension leads wound on drums. The power cable
must be suitable for frequent movements and with an abrasion
resistant sheath
(e.g. type H07RN-F).
Before connecting the mixer to the electrical mains, ensure that all
safety devices are fitted and are in perfect condition, and check in
particular that the hopper grid is secured in place, that the exten-
sion in good condition and that the plugs and sockets are not wet.
Connect the mixer socket on the electrical panel to the mains
(fig.5).
9.2 WATER CONNECTION (see fig. 1)
Connect the water hose (table 1) to the water mains.
With horizontal mixer without water pump,
t e r m a i n s m u s t g u a r a n t e e a m i n i m u m f l o w r a t e o f
20 l/min and a minimum pressure of 2 bar.
-perform air purge through appropriate valve before each start
-With a water pump mixer if the pump is not fed by water, the
sealing gasket burns
- the maximum water pressure must not exceed 5 bar
10. LOADING HEIGHTS (SEE FIG 6):
The SPIN15 continuous mixer can be operated at three different
heights.
The feet can slide within the frame before being locked in position
with the split pins at set heights, to enable three different loading
heights:
1) Direct loading of material into SMALL50 type plaster mixer;
2) Direct loading of material onto trolley;
3) Direct loading of materials into work bucket.
6
- Ensure that the power supply voltage, mains frequency
fig.5
the wa-

Advertisement

loading

This manual is also suitable for:

1106340