Download Print this page

Installation Guide - MATTRESS FIRM POWER BASE 900 Owner's Manual

Advertisement

Installation Guide

NOTE:
For safety reasons, lifting of the adjustable bed must always be performed by two (2)
people; and the unit should always be on a flat surface before opening.
Setting up your adjustable bed
FOR TWIN, TWIN XL, FULL, FULL XL, AND SPLIT CAL KING
MODELS
1
Lift the adjustable bed out of the shipping carton carefully, and
put it on a flat floor with the top side facing downward.
2
Remove all accessory boxes and cut the ties from inside the
adjustable bed.
FOR QUEEN, KING, AND CAL KING MODELS
1
Lift the two separate sections of the adjustable bed out of the
shipping carton carefully, and put them on a flat floor with the top
side facing downward.
2
Remove all accessory boxes and cut the orange ties from inside
the adjustable bed.
3
Move the head and foot sections of the bed together. Make sure
the bars and frames are properly aligned at the center.
4
To connect the head and foot sections, put the center connection
bracket over one end of the parallel bars between the head and
foot sections. Line it up with the pre-drilled holes on the bars.
5
Thread the screw through the center connection bracket and into
the bars to keep it in place.
6
Thread a nut at the end of the screw, and tighten it with the
wrench.
7
Repeat steps 4 to 6 to place the second center connection
bracket on the other end of the parallel bars.
6

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Ma004mf02