EN
4
4.1
Commissioning wizard
Commissioning wizard
As soon as the power supply to the controller is switched on, the
commissioning wizard starts automatically. This guides the installer
through the commissioning process.
Follow the instructions on the display to make the
following settings:
•
Set language
•
Set time and date
•
Start bleed program
•
Enter setpoints
4.2
Controller
6
5
7
44 / 144 – K410061000000-00 / 02.2022 – © www.kemper-olpe.de
Operation
4
3
2
1
2
3
4
5
6
Info
All data entered are saved automatically.
The commissioning process may take 30 to 60 minutes.
Operating elements with function
No Designation
1
Display
2
"OK"-button
1
3
"Esc"-button
4
"Down"-button
5
"Up"-button
6
Indicator light
Standard view of display
1
Outlet target temperature
2
Inlet target temperature
3
Inlet measured temperature
4
Pump capacity, drinking water circulation pump
5
Outlet measured temperature
6
Pump performance
7
Process medium buffer temperature
Function
Display
Enter
Back
(navigate down)
(navigate up)
Lit green: Cooling system switched on