Mounting The Transceiver Unit; Mounting The Power Supply Unit - Furuno FSV-24 Installation Manual

Color scanning sonar
Hide thumbs Also See for FSV-24:
Table of Contents

Advertisement

1.3

Mounting the Transceiver Unit

The transceiver unit should be mounted on a mounting base (shipyard supply)
whose dimensions are as shown in the outline drawing of the transceiver unit at
the back of this manual. The transceiver unit should be reinforced against
vibration by stays extending from the eyebolts on the top of the unit. Fasten 10
bolts (M12, local supply) at the bottom and back of the transceiver unit to fasten
it to the mounting location.
1.4

Mounting the Power Supply Unit

Weld four bolts (M8, local supply) referring to the outline drawing at the back of
this manual. Sets the power supply unit to the bolts welded, and then turn four
nuts (local supply) to fix.
Note: If necessary, reinforce the bulkhead since the unit weights 25 kg (57.3
lbs).
1-14
Transceiver unit
Power supply unit

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-24s

Table of Contents