Installation Requirements

A list of the contractor responsibilities typically associated
with the unit installation process is provided in table
below.
Table 4.
Installation requirements
Type
Foundation
Rigging
Isolation
Electrical
Water piping
Insulation
Water Piping Connection Components
Other Materials
"Sintesis Model RTAF Installation
Completion Check Sheet and Request
for Trane Service"
(RTAF-ADF001*-EN,
see
"Log and Check Sheets," p.
Chiller Start-up Commissioning
(a) Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.
RTAF-SVX001K-EN
Trane Supplied
Trane Installed
• Circuit breakers
(optional)
• Unit mounted starter
• Flow switch
• Insulation
• Grooved pipe
• R-134a or R-513A
refrigerant
• Dry nitrogen
(optional)
98)
• Trane, or an agent of
Trane specifically
(a)
authorized to perform
®
start-up of Trane
products
Trane Supplied
Field Supplied
Field Installed
Field Installed
• Meet foundation requirements
• Safety chains
• Clevis connectors
• Lifting beam
• Spreader bar
• Elastomeric isolators
• Elastomeric isolators (optional)
(optional)
• Circuit breakers (optional)
• Electrical connections to unit mounted starter
• Wiring sizes per submittal and NEC
• Terminal lugs
• Ground connection(s)
• BAS wiring (optional)
• Control voltage wiring
• Chilled water pump contactor and wiring
• Option relays and wiring
• Taps for thermometers and gauges
• Thermometers
• Water flow pressure gauges
• Isolation and balancing valves in water piping
• Vents and drain
• Waterside pressure relief valves
• Water strainer
• Insulation
• Flange kit (optional)
Pre-Installation
®
products. Contractor shall
15