Operation panel
indication
Name
Option fault
Description
The inverter output is shut off if a plug-in option is disconnected while the converter unit power is ON.
• Check if a plug-in option is connected.
Check point
• Check for excessive noise around the converter unit.
• Disconnect the plug-in option. (Plug-in options cannot be used.)
• Take measures against noise if there are devices producing excess electrical noises around the converter
Corrective action
Others
The fault history and the operation status of the inverter are displayed. It is not a fault.
Operation panel
indication
Name
24 V external power supply operation
Description
Blinks when the main circuit power supply is off and the 24 V external power supply is being input.
Check point
Power is supplied from a 24 V external power supply.
• Turning ON the power supply (main circuit) of the converter unit clears the indication.
Corrective action
• If the indication is still displayed after turning ON of the power supply (main circuit) of the converter unit, the
Operation panel
indication
Name
Parallel operation slave 1
Description
Appears on the first monitor screen of the slave 1 inverter (Pr.1001 Parallel operation selection = "1").
Operation panel
indication
Name
Parallel operation slave 2
Description
Appears on the first monitor screen of the slave 2 inverter (Pr.1001 Parallel operation selection = "2").
NOTE
• If faults other than the above appear, contact your sales representative.
E. 1
unit.
If the situation does not improve after taking the above measure, contact your sales representative.
EV
power supply voltage may be low.
SLV.1
SLV.2
Causes and corrective actions
PROTECTIVE FUNCTIONS
6
149