Advertisement

Quick Links

Dear Client
Thank you for Purchasing our TAG-8000 Wireless HV Phase
Tester. Please read the manual in detail prior to first use, which will
help you use the equipment skillfully.
company's products continually, so there may be
slight differences between your purchase equipment
and its instruction manual. You can find the changes
in the appendix. Sorry for the inconvenience. If you have further
questions, welcome to contact with our service department.
may bring voltage, when you plug/draw the test wire or
power outlet, they will cause electric spark. PLEASE
CAUTION RISK OF ELECTRICAL SHOCK!
Company Address:
 T4,No. 41, High-tech 2 Road,East Lake High-tech Development Zone,
Wuhan
 Sales Hotline: 86-27- 87457960
 After Service Hotline: 86-27- 87459656
 Fax: 86-27- 87803129
 E-mail: qiao@hvtest.cc
 Website: www.hvtest.cc
Our aim is to improve and perfect the
The input/output terminals and the test column
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAG-8000 and is the answer not in the manual?

Questions and answers

Summary of Contents for HVTest TAG-8000

  • Page 1 Dear Client Thank you for Purchasing our TAG-8000 Wireless HV Phase Tester. Please read the manual in detail prior to first use, which will help you use the equipment skillfully. Our aim is to improve and perfect the company's products continually, so there may be slight differences between your purchase equipment and its instruction manual.
  • Page 2  SERIOUS COMMITMENT All products of our company carry one year limited warranty from the date of shipment. If any such product proves defective during this warranty period we will maintain it for free. Meanwhile we implement lifetime service. Except otherwise agreed by contract.
  • Page 3 ground pole of the shell must be grounded. To prevent electric shock, the grounding conductor must be connected to the ground. Make sure the product has been grounded correctly before connecting with the input/output port. Pay Attention to the Ratings of All Terminals To prevent the fire hazard or electric shock, please be care of all ratings and labels/marks of this product.
  • Page 4 -Security Terms Warning: indicates that death or severe personal injury may result if proper precautions are not taken Caution: indicates that property damage may result if proper precautions are not taken.
  • Page 5: Table Of Contents

    Content  Product Introduction................6  Working Principle................6  Safety Precautions................7  Technical Parameters................8  Instrument Introduction............... 9  Short-range phase detector..............13  Remote Phase Detection..............15  Result judgment and analysis............17  Maintenance..................17  Factory configuration list..............18 ...
  • Page 6: Product Introduction

     Product Introduction Remote wireless high-voltage phase detector ( Hereinafter referred to as "instrument" ) It is used for long distance(apart from 300 meters to 800 kilometers )to check whether the high voltage phase is in phase and whether the phase sequence color is marked correctly . It can also be used for short distance grid connection or loop network core phase.
  • Page 7: Safety Precautions

    determine the phase difference.。 Both machines can be used for remote phase verification. When the remote phase detector is used, two Y transmitters send the measurement data to two receiving hosts respectively. The host is measured synchronously after timing by GPS. The phase difference between the two hosts is calculated as the phase difference between the two lines to judge the same and different phases of the two lines。...
  • Page 8: Technical Parameters

     Technical Parameters 1. Phase difference accuracy: error ≤5°. 2. Frequency accuracy: ± 0.1Hz. 3. The measurement range of the cross-voltage is 0.22kv ~ 220kV. 4. The maximum transmission visual distance between the transmitter and the receiving host is about 100 meters. 5.
  • Page 9: Instrument Introduction

    12. The transmitter's working power consumption is < 0.1w, and the receiver's working power consumption is < 0.3w. 13. Working environment: humidity ≤95%RH at -35℃--- +45℃. 14. Machine weight: about 3.6kg. 15. Package size of the instrument: length 56cm* width 26cm* height 13cm.
  • Page 10 Receiving host Launcher X/Y Collector X/Y Insulation rod Charger Accessory box 2、Instrument Operation Introduction Indicator light: (a) (A) Out of phase red light is on: the two lines are out of phase. (b) (B) The same phase green light is on: the two lines are in phase.
  • Page 11 Indicator light: During measurement: red light and green light flash alternately. Charging: red light is charging, green light is full. Buzzer: In case of contact with high voltage live line, the buzzer will sound, indicating that the line is live. When starting, 3 beeps indicate that the power is sufficient, 2 beeps indicate that the power is available, and all beeps indicate that...
  • Page 12 Indicator: When charging: The charging indicator is red and green when fully charged. Buzzer: When it comes into contact with the high-voltage live line, it will beep every 4 seconds, indicating that the line is live and the collector is started. Elastic band: Switchgear collector Attach the collector to the busbar and bundle...
  • Page 13: Short-Range Phase Detector

    displays two transmitter information. This phenomenon is normal and does not affect the use of the instrument. When both transmitters are powered on, the instrument display is not affected by the short distance. 2.there is a 2m resistor in the self-test line, and when people contact the alligator clamp during the test, they will not get electric shock.
  • Page 14 2.High voltage switchgear live display nuclear phase (low voltage high voltage phase detection) Replace the hooks of the X and Y transmitters with pointed terminals, and insert the live display, then insert the DC end of the ground wire into the transmitter grounding hole (also the charging hole), the alligator clip is grounded, and the receiving host powers on to select the short-range nuclear phase mode,then the measurement can be carried out.
  • Page 15: Remote Phase Detection

    whether the switch cabinet is live or not, it is not a standard nuclear phase point, and the live displays of different manufacturers, different periods and different standards will have different degrees of phase shifting problems, and the corresponding relationship between the live displays L1, L2, L3 and the bus is not necessarily correct.
  • Page 16 transmitter will be contacted with the live line under test. At this time, the two receiving hosts will record a set of data every 10 seconds,No1 to No6 are the data of 0s, 10s, 20s, 30s, 40s and 50s per minute respectively. Compare the data of the same number of A and B to judge the same and different phase.
  • Page 17: Result Judgment And Analysis

    (2) if the two units(A and B machine) measure in a short distance (less than 300m apart), the wireless signals of the two transmitters will interfere with each other, which may invalidate the measurement results。  Result judgment and analysis The results are judged by the national standard A standard, the same phase is bounded by 30 °.
  • Page 18: Factory Configuration List

    environment. 3. The insulation rod should be subjected to a withstand voltage test before the first use, and an annual withstand voltage test。  Factory configuration list Item Name Number Number of single whole set machines Aluminum alloy case 1pcs 2pcs Receiving host 1pcs...
  • Page 19: After-Sales Service

    head. (2) There is a resistance inside the self-testing test line, and people will not get an electric shock when they touch the crocodile clip during the self-test of the mains. (3) The grounding wire is a straight-through wire, which is only used in low-voltage (voltage <1kV) occasions.。...
  • Page 20 Appendix A Supplementary description of insulating rod parameters The insulating telescopic pole (material) is selected from the moisture-proof insulation pipe produced by the military industry. It conforms to the IEC / 1C78 standard and has the characteristics of moisture resistance, high pressure resistance, impact resistance, and bending resistance.
  • Page 21 Appendix B The synchronous mode of generator grid connection is divided into quasi synchronous mode and self synchronous mode The quasi-synchronous juxtaposition is to add the excitation of the generator that is not put into the system, and adjust its voltage and frequency.
  • Page 22 Advantages The juxtaposition process is relatively fast. Short parallel time since the same period, suitable for grid connection of small hydropower。...

Table of Contents