EQUIPMENT MANUAL FOR RF-9122 GSM900-GSM1800 FSR
3.3 INSTALLATION PROCEDURES
3.3.1 GOODS INWARDS INSPECTION
This equipment was factory tested, inspected, packed, and delivered to the carrier with utmost care.
Do not accept shipment from carrier which shows damage or shortage until the carrier's agent
endorses a statement of the irregularity on the face of the carrier's receipt. Without documentary
evidence, a claim cannot be processed.
Open and check each package against the packing list. For any shortage, contact Comba Telecom
Systems. Do not remove items from packing materials until installation.
3.3.2 TOOLS
See appendix for a full list of recommended tools required for installation and maintenance.
3.3.3 PREPARATION
Equipment:
Mounting surface or pole capable of support chassis' weight: < 51kg
Power outlet within 2m / 6.5 ft.
Terminate unused antenna ports with a 50 ohm terminator.
Earthing point/Safety ground within 2m / 6.5 ft.
Antenna:
Antenna installation is covered by their respective manuals. Take normal precautions when
preparing and handling feeder cables to ensure they are not damaged.
RF-9122T18 QE
ENU Status : 1-0-0
Copyright - refer to title page
Page 26