Verifying the Installation

1. Check that there is no foreign matter in the cabinet.
UPS5000-S-200K-FM
(1) Rear of modules
2. After verifying the installation, reinstall all the
covers.
3. (Remove the paper protective film from the
sealing putty.) After routing cables and
verifying cable connections, seal the gap
between cables and the cabinet using sealing
putty.
Paper protective
film
5

Powering On and Starting the UPS

1. Before powering on the UPS, ensure that the UPS has passed all check items in the
Commissioning and Acceptance Report
2. Measure the voltage and frequency of the UPS upstream input switch. The line voltage range
is 138–485 V AC, and the frequency range is 40–70 Hz.
(2) Cabinet top
(3) Wiring terminal blocks
4. Do not remove the dustproof cover
Sealing putty must
be used as a whole
Sealing putty
and the gap can be
sealed only from
the top.
and Chapter 4.
7
UPS5000-S-300K-SMT
before power-on to prevent dust inside
the UPS.
Dustproof cover
(4) Switches